Ada County Operations Logo
Ada County Operations
A A A
Home > Major Projects > Current Fiscal Year (Oct 1-Sept 30)

Current Fiscal Year (Oct 1-Sept 30)

ARPA projects

Barber Park Pathways and Bridges – .25 Mile Forest Loop

Expo Horse Barn Demo

Expo Idaho Park Development

Expo Roof Replacement

Greenbelt Pathway – Boise River Bank Stabilization, Erosion Project

Juvenile Outdoor REC Area

Projects

400 Benjamin Security Upgrade

400 Benjamin Driver License Workstation and Office Carpet Replacement

400 Benjamin EV Charging Stations

400 Benjamin RTUs – Elections

400 Benjamin York R22 Roof Top Unit Replacement

Barrister UVC Light Installation

Coroner’s Building

Courthouse 2nd Floor Courtroom Carpet Replacement

Courthouse 3rd Floor IT Area Carpet Replacement

Courthouse Cooling Tower re-surface or replace

Courthouse Front Revolving Door Replacement

Courthouse HR/ Procurement Wall

Courthouse J2 Security Desk

Courthouse J2 Security Upgrade

Courthouse Roof Replacement Sections 1a, 2a, 4a, 4b & 5

Development Services Lobby Workstation Reconfiguration

Expo Building & Parking Lot Lighting Upgrade

Expo Small & Large Animal Barn Lighting Project

HSU Chiller Replacement

Jail E Pod Expansion – Design Only

Jail Replace Penthouse Heating Boilers 1 & 2 and PSB Chiller

Jail Security VMS & Building ACL Refresh

Jail Trane Chiller & AquaSnap, PSB Liebert Chiller Replacement

Juvenile Modular Trailer – Liberty

Juvenile R22 RTU Replacement

Juvenile Shower

Juvenile Switchboard & Generator

Paramedics Security Upgrade

PSB CCU Back Up Generator Replacement

PSB FSB Boiler 1 & Pod C Domestic Boiler

PSB FSB LED Lighting Upgrade

PSB Homicide Evidence Storage Area

PSB Window Replacement

Sheriff’s Vehicle Shop Roof Replacement

Solid Waste Education Center Remodel – Design Only

Solid Waste Groundwater Treatment

Solid Waste Hangar Demolition

Solid Waste Metal Building

Solid Waste NRC #4

Solid Waste Perimeter Odor Detection Installation

Solid Waste Renewable Natural Gas

Solid Waste Solar & Wind for New Admin Building

Solid Waste WIFI Pole Install

TCA Center Purchase/Remodel-Formal RFQ